Penn South I Before During 1
Penn South I Before During 1

Penn South I Before During 2
Penn South I Before During 2

Penn South I Before During 3
Penn South I Before During 3

Penn South I Before During 1
Penn South I Before During 1

1/3

MANHATTAN

PENN SOUTH i

BEFORE/DURING

J. Costa Construction created a more operable kitchen by slightly opening wall in Kitchen entry.  This opened the room for larger cabinets and long tiles. Shower was added in alcove of bathroom, which is tiled with Carrara porcelain.