top of page
Penn South II Before During 1
Penn South II Before During 2
Penn South II Before During 1
1/2
MANHATTAN
penn south ii before/during
J. Costa Construction created a more operable kitchen by slightly opening wall in Kitchen entry. This opened the room for larger cabinets and long tiles. Shower was added in alcove of bathroom, which is tiled with Carrara porcelain. We converted an existing powder room into a full bathroom by creating a custom shower.
bottom of page